• Jan 30, 2012

University of Wisconsin Hospital and Clinics, Madison, Wisconsin has contracted with MDI Solutions to provide a Senior Integration Analyst, to perform a Health Check and conduct Level 1 and 2 Training on their Cloverleaf interface software. MDI Solutions has assigned a senior integration analyst to assess the current Cloverleaf interface environment and assist the ...

Read More
  • Dec 19, 2011

CharterCARE Health Partners, Providence, RI has extended its relationship with MDI Solutions and contracted for ten (10) separate interfaces to be developed with a five month go-live timeframe. MDI will be required to develop ADT and Laboratory and Radiology Results interfaces between Meditech and ten independent vendor systems by performing eGate 5.1.3 SRE software ...

Read More
  • Nov 07, 2011

MDI Solutions successfully converted the eGate™ interfaces at the Children’s Hospital of Eastern Ontario (CHEO) in Ottawa, Ontario to the MD Link™ integration engine. Following the announcement update from Oracle that they were sun setting their eGate integration engine, CHEO sought out a company that could provide a system with proven stability, flexibility ...

Read More
  • Oct 25, 2011

Hawaii Health Systems Corporation (HHSC), Honolulu, Hawaii, will utilize MDI Solutions technical resources to convert their Sybase Impact™ interfaces to Siemens’ OPENLink™ integration engine. As part of their implementation of the Siemens Soarian™ HIS, HHSC will be converting from the Sybase Impact integration engine to Siemens’ OPENLink engine software. ...

Read More
  • Sep 12, 2011

Summit Orthopedics, Ltd., Woodbury, MN, has extended its relationship with MDI Solutions and contracted for 7 separate interfaces to be developed with a 3 month go-live timeline. MDI will be required to develop ADT, Scheduling, Master File, OR and DFT Charge interfaces between the newly implemented Exscribe EMR and GE Centricity, eRAD and WhitePlume systems. With a ...

Read More
← Older Entries / Newer Entries →